I said I wasn't going to do an update again until the ribs were done. They aren't, but Shelby has put in over 40 hours of deburring since the last update and I've started on the fuselage now that the bottom skin arrived from backorder. We've primed two sets of ribs so far and I've made progress through most of the Center Section Bulkhead and Mid-Fuse Ribs & Bottom Skins sections. I've started deburring the fuselage pieces for priming and assembly, hopefully later this week.
Thanks to Brantel
Big thanks to Brantel. I messaged him a few months ago about fuselage painting and he gave some tips, one of which was to prime with something other than the ZC Green so that any scratches don't show up as green. So the entire fuselage will be primed in Charcoal Gray instead. I am not going to take his advice of final painting everything before assembly. My plan is to finish the fuselage and then take it to a local body shop for painting of the interior. That sounds like a massive project, but I'll continue my philosophy of "one bite of the elephant" and think about that when the time comes.
Also thanks to his very thorough blog. It's a great reference for when I want to verify that I understand a part of the KAI correctly. Invaluable resource for sure.
October hours
We've done a lot of hours in October, I think our busiest month yet. 56.9 combined hours so far this month and 325 total on the project, and there's momentum building. We keep telling people we want to have the plane flying by Oshkosh next year (already an extension from the 12 month timeline we originally gave ourselves) but I think 18 months isn't bad from no airplane experience to airplane, pilot licenses, and LSRM.
Out of room
We've run out of room. For everything. Between the airplane, the stalled basement remodel that's resuming soon, and our exchange student, we have no space left for the assembled airplane and the basement needs to be cleared out. So we rented a storage unit and we're going to store (insured) airplane parts in there. Just airframe pieces like the tailcone and stabilator. We rented a U-Haul (first of multiple throughout this process, the next one will probably be to bring the fuselage to a body shop) and moved everything this morning.
Everything has arrived
Everything has arrived at this point. The avionics (G3X unfortunately, but we'll make it work) were delivered a few weeks ago. Definitely the most expensive UPS package I've ever received. The shipping was over $1,000 which surprised me, but I'm guessing it was mostly insurance. We have all of the backordered pieces as well, so at this point it's on us to assemble everything.
Replacement parts
A couple small things. A rear spar of a wing was stepped on (not placing blame here...). It could probably bend out, but for a wing spar I'm taking absolutely zero chances, so there's $78. Also when building the fuselage I noticed that we got two of one piece rather than one of one and one of another. They were only one number off so it's an easy mistake to make. I'll probably just pay the $28 for the correct one rather than wait a few extra days for Vans to correct it, since it would be a blocker in the fuselage build.
Open questions with Vans
We sent Vans two questions and are waiting on follow ups. I have preliminary information from the VAF forum, but I do prefer to have a statement from the manufacturer for my official build log. One was regarding the wedge tool. It was causing a bit of distortion in the head of the rivet. I bought ATS's angle puller instead and will be using that going forward. The second was regarding nutplates and the CCR rivets. No matter what I do I can't get them to be snug and they wiggle quite a bit. I know this is normal, but was hoping for some tips there.
About this log
I'll attach a bunch of pictures with captions as well. Unlike Brantel I'm not super detailed on the build process itself. There are better resources like his blog for a step by step breakdown. I guess I'm considering this build log to be the more logistical side of building a plane, and I hope the detailed breakdown of the process, costs, tool list, and everything else helps people. Oh yeah, we bought a few more tools as well. I feel like there's always tools to buy.
Photos