N940SP
reservations
service difficulty reports
7 reports
- 28 Nov 2011
Bearing Cage, loose
DURING INSPECTION OF GEARBOX FOR METAL IN OIL, IT WAS NOTED THAT 5 OF THE 6 STUDS THAT SECURE THE 2.5 BEARING CAGE TO THE GEARBOX COVER ASSY HAD BACKED OUT…
- 19 Apr 1999
Mixture Control, out of adjust
NEW CESSNA WITH 9.0 HOURS FOUND MIXTURE CONTROL WOULD NOT HIT FULL RICH STOP ON FUEL CONTROL AND CONTROL IN COCKPIT HAD NO CUSHION. RE-ADJUSTED MIXTURE…
- 19 Apr 1999
Fitting, bent
NEW CESSNA WITH 9.0 HOURS HAD COPILOT'S SEAT BACK RECLINED APPROXIMATELY 4 INCHES. FOUND SEAT BACK SUPPORT FITTING BENT. REPLACED SUPPORT FITTING WITH CESSNA…
- 19 Apr 1999
Bellcrank, out of adjust
FOUND NEW CESSNA AT FACTORY HAD ELEVATOR HALVES MISALIGNED BY .25 INCH. WHEN STREAMLINED WITH LOWER HORIZONTAL STABILIZER, ONE SIDE WAS .25 INCH OUT OF…
- 19 Apr 1999
Trim Tab, out of adjust
FOUND NEW CESSNA AT FACTORY HAD TRIM TAB INCORRECTLY ADJUSTED. WHEN TRIM WHEEL IN COCKPIT ALIGNED TO TAKEOFF POSITION, TRIM TAB WAS DOWN .25 INCH INSTEAD OF…
- 19 Apr 1999
Selector Valve, leaking
NEW CESSNA C-172'S ON FERRY FLIGHT FROM FACTORY, ALTIMETER AND VERTICAL VELOCITY INDICATORS HAD EXCESSIVE FLUX. FOUND STATIC LINE TO STATIC SELECTOR VALVE…
- 19 Apr 1999
Clamp, leaking
NEW CESSNA WITH 9.0 HOURS. ON ACCEPTANCE INSPECTION, FOUND EXHAUST RISER CLAMPS NOT PROPERLY SEATED AND LEAKING EXHAUST. LOOSENED CLAMPS AND EXHAUST RISER…