search

N916UW

1982 Boeing 757-225 standard FAA →

earlier registrations

1 past record
  1. 1982

    U S Bank Na Trustee

    1982 Boeing 757-225

    deregistered 22 Aug 2011

    s/n 22192 engine Rolls-Royc RB-211 Series

service difficulty reports

29 reports
  1. 15 May 2009

    Power Supply, discharged

    Boeing 757225

    BOS - THE EMERGENCY LIGHT BETWEEN DOORS L3 AND R3 DOES NOT LIGHT UP. REPLACED THE EMERGENCY POWER SUPPLY ASSEMBLY.

  2. 22 Apr 2009

    Skin, corroded

    Boeing 757225

    CLT - C1 - MAJOR REPAIR - CORROSION ON INNER SKIN SURFACE OF ELECTRONICS BAY ACCESS DOOR. REPLACED ELECTRONICS BAY ACCESS DOOR INNER SKIN IAW B757 SRM…

  3. 20 Apr 2009

    Door Frame, cracked

    Boeing 757225

    CLT - C1 - MAJOR REPAIR - CRACK AT L-2 DOOR GUSLOCK CUTOUT. REPAIRED L-2 DOOR GUSLOCK CUTOUT ON DOOR FRAME IAW US AIRWAYS EA 101105.

  4. 16 Apr 2009

    Attach Bracket, cracked

    Boeing 757225

    CLT - C1 - MAJOR REPAIR - CRACK AT FORWARD CARGO DOOR FRAME ATTACH BRACKET AT BS 570, 14R. REPAIRED FORWARD CARGO DOOR FRAME ATTACH BRACKET AT BS 570, 14R IAW…

  5. 16 Apr 2009

    Pushrod, broken

    Boeing 757225

    CLT - C1 - EES - L1 DOOR SLIDE ACTIVATION PUSH ROD "A" HAS BROKEN ROD ENDS. REPLACED L1 DOOR SLIDE ACTIVATION PUSH ROD "A" IAW B757 AMM 52-11-20.

  6. 15 Apr 2009

    Door Frame, cracked

    Boeing 757225

    CLT - C1 - MAJOR REPAIR - CRACK AT R4 DOOR FRAME AT BS 1650, S15R. REPAIRED R4 DOOR FRAME AT BS 1650, S15R IAW US AIRWAYS EA 101093.

  7. 14 Apr 2009

    Bearing, frozen

    Boeing 757225

    CLT - C1 - EES - L4 DOOR EMERGENCY POWER ASSIST TRIGGER CAM BEARING FROZEN. REPLACED L4 DOOR EMERGENCY POWER ASSIST TRIGGER CAM BEARING IAW B757 AMM 52-11-20.

  8. 1 Feb 2009

    Seal, broken

    Boeing 757225

    CLT - THE SEAL ON THE MOST AFT RAFT IS BROKEN. MAINTENANCE REPLACED BROKEN SEAL ON MOST AFT RAFT.

  9. 5 Sep 2008

    Acm, damaged

    Boeing 757225

    TPA FLT 1089 ENROUTE CLT TO TPA. DURING DESCENT THE LT AIR CONDITIONING PACK WENT TO FULL HOT WITH A BURNING ODOR. WHEN THE LT PACK WAS SHUT OFF, THE ODOR…

  10. 2 Mar 2008

    Actuator, failed

    Boeing 757225

    SJU STT-PHL FLT NR 1012 - AFTER TAKEOFF, THE GEAR WOULD NOT RETRACT AND THE GEAR LEVER WOULD NOT RAISE PAST THE OFF POSITION. CREW HAD THREE GREEN LIGHTS AND…

  11. 20 Dec 2007

    Actuator, failed

    Boeing 757225

    FLIGHT 1619, PHL-FLL: AFTER TAKEOFF, THE APU SHUTDOWN. THE RIGHT GENERATOR SYSTEM WAS ALREADY ON MEL, SO THE FLIGHT RETURNED TO PHL. MAINTENANCE REPLACED THE…

  12. 4 Oct 2007

    Intercostal, corroded

    Boeing 757225

    PIT - MAJOR REPAIR - C-4 CHECK, CORROSION ON INTERCOSTAL, BS 640. REPLACED INTERCOSTAL, BS 640 IAW B757 SRM 53-00-51 AND 51-70-12.

  13. 4 Oct 2007

    Seat Track, corroded

    Boeing 757225

    PIT - MAJOR REPAIR - C-4 CHECK, CORROSION ON CABIN SEAT TRACK, BS 640, RBL 45.50. REPAIRED SEAT TRACK, BS 640, RBL 45.50 IAW B757 SRM 53-00-52 AND 51-70-12.

  14. 26 Sep 2007

    Seat Track, corroded

    Boeing 757225

    PIT - MAJOR REPAIR - C-4 CHECK, CORROSION ON CABIN SEAT TRACK, BS 710, BS 740 AND BS 757, RBL45.5. REPAIRED CABIN SEAT TRACK, BS 710 - 757, RBL 45.5 IAW B757…

  15. 26 Sep 2007

    Floorbeam, corroded

    Boeing 757225

    PIT - MAJOR REPAIR - C-4 CHECK, CORROSION ON FLOORBEAM T-CAP, BS 365.25. REPAIRED FLOORBEAM T-CAP, BS 365.25 IAW USAIRWAYS TYPICAL REPAIR 53-15-01.

  16. 26 Sep 2007

    Pan, corroded

    Boeing 757225

    PIT - MAJOR REPAIR - C-4 CHECK, CORROSION ON THE FORWARD LAVATORY SERVICING DOOR CUTOUT PRESSURE PAN, BS 418 - BS 428, S27L - S29L. REPLACED THE FORWARD…

  17. 24 Sep 2007

    Floor Support, corroded

    Boeing 757225

    PIT - MAJOR REPAIR - C-4 CHECK, CORROSION ON FLOOR SUPPORT ANGLE, BS 800 - BS 880, S17. REPAIRED FLOOR SUPPORT ANGLE, BS 800 - BS 880, S17 IAW B757-200 SRM…

  18. 17 Sep 2007

    Intercostal, cracked

    Boeing 757225

    PIT - MAJOR REPAIR - C-4 CHECK, CRACKED FLOOR SUPPORT INTERCOSTAL, BS 1520 - BS 1540, BL 0, WL 208.1. REPLACED FLOOR SUPPORT INTERCOSTAL, BS 1520 - BS 1540,…

  19. 15 Sep 2007

    Floor Support, corroded

    Boeing 757225

    PIT - MAJOR REPAIR - C-4 CHECK, CORROSION ON FLOOR SUPPORT, BS 324 - BS 345, RBL 63. REPLACED FLOOR SUPPORT, BS 324 - BS 345, RBL 63 IAW B757-200 SRM 51-40-02.

  20. 15 Sep 2007

    Floorbeam, corroded

    Boeing 757225

    PIT - MAJOR REPAIR - C-4 CHECK, CORROSION ON FLOORBEAM, BS 1640, LBL 20 - RBL 60. REPLACED FLOORBEAM, BS 1640, LBL 20 - RBL 60 IAW USAIRWAYS TYPICAL REPAIR…

  21. 15 Sep 2007

    Seat Track, corroded

    Boeing 757225

    PIT - MAJOR REPAIR - C-4 CHECK, CORROSION ON SEAT TRACK, BS 1620 - BS 1640, RBL 25. REPLACED SEAT TRACK, BS 1620 - BS 1640, RBL 25 IAW B757-200 SRM 51-40-02.

  22. 15 Sep 2007

    Angle, corroded

    Boeing 757225

    PIT - MAJOR REPAIR - C-4 CHECK, CORROSION ON ANGLE, BS 480 - BS 500, RBL 10. REPLACED ANGLE, BS 480 - BS 500, RBL 10 IAW B757-200 SRM 53-00-051.

  23. 15 Sep 2007

    Angle, corroded

    Boeing 757225

    PIT - MAJOR REPAIR - C-4 CHECK, CORROSION ON ANGLE, BS 1620 - BS 1640, BL 0. REPAIRED ANGLE, BS 1620 - BS 1640, BL 0 IAW B757-200 SRM 53-00-051 REPAIR 4.

  24. 14 Sep 2007

    Floor Support, corroded

    Boeing 757225

    PIT - MAJOR REPAIR - C-4 CHECK, CORROSION ON FLOOR SUPPORT, BS 324 - BS 345, RBL 60. REPLACED FLOOR SUPPORT, BS 324 - BS 345, RBL 60 IAW B757-200 SRM 51-40-02.

  25. 14 Sep 2007

    Floorbeam, corroded

    Boeing 757225

    PIT - MAJOR REPAIR - C-4 CHECK, CORROSION ON FLOORBEAM, BS 1640. REPLACED FLOORBEAM, BS 1640 IAW USAIRWAYS TYPICAL REPAIR 53-15-01.

  26. 14 Sep 2007

    Web, corroded

    Boeing 757225

    PIT - MAJOR REPAIR - C-4 CHECK, CORROSION ON WEB, BS 1681 - BS 1701, S17L. REPLACED WEB, BS 1681 - BS 1701, S17L IAW B757-200 SRM 51-40-02.

  27. 14 Sep 2007

    Intercostal, cracked

    Boeing 757225

    PIT - MAJOR REPAIR - C-4 CHECK, CRACKED INTERCOSTAL, BS 660 - BS 680, BL 0. REPLACED INTERCOSTAL, BS 660 - BS 680, BL 0 IAW B757-200 SRM 50-30-51.

  28. 12 Sep 2007

    Channel, corroded

    Boeing 757225

    PIT - MAJOR REPAIR - C-4 CHECK, CORROSION ON CHANNEL, BS 1640 - BS 1660, BL 0. REPLACED CHANNEL, BS 1640 - BS 1660, BL 0 IAW B757-200 SRM 51-40-02.

  29. 17 Jul 2007

    Antenna, failed

    Boeing 757225

    FLIGHT 807, CLT-CUN: FLIGHT RETURNED TO CLT DUE TO INOPERATIVE WEATHER RADAR FAILURE. MAINTENANCE REPLACED THE WEATHER RADAR ANTENNA. NO FURTHER FAULTS.

Copied daily from public FCC, FAA and NTSB downloads. Not affiliated with any of them.

sources and dates
sourcerecordsas of
FCC amateur1,702,05624 Nov 2026
FCC GMRS633,27224 Nov 2026
FCC ship radio403,52022 Nov 2026
FCC antenna structures198,13522 Nov 2026
FCC aircraft radio153,38322 Nov 2026
FAA airmen910,1651 Nov 2026
FAA deregistered aircraft383,84423 Nov 2026
FAA registered aircraft319,59223 Nov 2026
FAA N-number reservations126,12623 Nov 2026
FAA dealers12,51023 Nov 2026
FAA airports19,43329 Oct 2026
FAA service difficulty reports1,699,33524 Nov 2026
NTSB accidents, 1982 on88,0301 Nov 2026

History is kept: records the agencies stop publishing stay here, marked with the date they left.

Airmen who keep their address private aren't in the FAA's download, so they aren't here.

Not a consumer report: don't use it to screen anyone for a job, a lease, credit or insurance.

To hide your address here, email george.main@gemiv.net.