N407US
1996 Bell Helicopter Textron Canada 407 standard FAA →
registration
- 1996
earlier registrations
1 past record
- 1988
service difficulty reports
61 reports
- 13 Aug 2002
Actuator, failed
ON CLIMB OUT, ENROUTE, CREW REPORTED THE LEFT MAIN LANDING GEAR WOULD NOT RETRACT AFTER PLACING GEAR LEVER TO THE UP POSITION. THE LEFT MAIN LANDING GEAR…
- 8 Aug 2002
Card, faulty
ON CLIMB OUT FROM PIT, CREW REPORTED THE LEFT MAIN LANDING GEAR RED AND GREEN LIGHTS ILLUMINATED WHEN THE GEAR WAS RETRACTED. CREW CYCLED GEAR WITH SAME…
- 8 Aug 2002
Circuit Card, faulty
ON CLIMB OUT, CREW REPORTED THE LT MAIN LANDING GEAR RED AND GREEN LIGHTS ILLUMINATED WHEN GEAR WAS RETRACTED, CYCLED GEAR WITH SAME RESULTS. WHEN GEAR WAS…
- 18 Apr 2002
Battery Pack, discharged
TPA - FOUND CENTER AISLE AND RIGHT OVERWING EMERGENCY EXIT LIGHTS INOPERATIVE. MAINTENANCE REPLACED TWO BATTERY PACKS. (M)
- 10 Mar 2002
Indicator, faulty
BDL - FLT 482 - ON SHORT FINAL TO ALB, WHEN FLAPS WERE SELECTED TO 10 UNITS, CAPTAIN RECEIVED A FLAP INDICATOR NEEDLE SPLIT AND ASSOCIATED LEADING EDGE DEVICE…
- 12 Nov 2001
Charger, failed
TPA - MAINTENANCE FOUND THE BULLNOSE EMERGENCY LIGHT AT ROW 9, RIGHT SIDE, INOPERATIVE. MAINTENANCE REMOVED AND REPLACED THE BATTERY CHARGER ASSEMBLY. OPS…
- 28 Jun 2001
Transmitter, faulty
CLT - FLT 1157 - IN PREPARATION FOR LANDING AT CLT, FROM ORD, CREW REPORTED A SPLIT FLAP INDICATION AS FLAPS WERE STUCK AT 7 DEGREES. FLIGHT LANDED WITHOUT…
- 25 May 2001
Bulkhead, cracked
CLT - FOUND PRESSURE WEB .5 INCH, .75 INCH AND 1.5 INCH, BS 178 WL 199 AND 201, LBL 6.5 TO RBL 6.5. REMOVED DAMAGED, INSTALLED REPAIR FILLERS AND DOUBLER PER…
- 25 May 2001
Doubler, cracked
CLT - FOUND REPAIR DOUBLER CRACKED .5 INCH, NR 2 SLAT, OUTBOARD OF ACTUATOR ATTACH. REMOVED CRACKED DOUBLER, INSTALLED NEW DOUBLER PER SRM 57-43-01. (M)
- 26 Oct 2000
Bypass Valve, faulty
BTV - FLT 1567 - ON APPROACH INTO BTV, THE FLAPS TO EXTEND AS THEY WOULD NOT MOVE FROM 5 DEGREES. MOVING FLAP LEVER UP OR DOWN WOULD NOT MOVE FLAPS. CREW WAS…
- 22 Feb 2000
Skin, cracked
TPA - FOUND DOOR SKIN CRACKED .25 INCH, LOWER HINGE CUTOUT FORWARD SERVICE DOOR. INSTALLED DOUBLER PER SRM AND TR 52-40-03A. (M)
- 23 Oct 1999
Skin, cracked
CLT - DURING RON VISUAL INSPECTION, FOUND A 1.250 INCH SKIN CRACK JUST BELOW STRINGER 23L AND 3 INCH AFT OF STATION 727D. INSTALLED REPAIR DOUBLER PER EA…
- 29 Jun 1999
Egt Light, illuminated
CLT - FLT 932 - UPON CLIMB-OUT FROM CLT, AP APPROX 18,000 FT, THE NR 1 ENGINE EGT LIGHT ILLUMINATED AS THE NR 1 ENGINE EXCEEDED LIMITS. CAPTAIN PULLED THE…
- 19 May 1999
Support, corroded
CLT - DURING SHOP VISIT, FOUND CORROSION IN BEARING RETAINER BORE AT INBOARD MID FLAP OUTBOARD CARRIAGE, OUTBOARD SUPPORT ARM AT ECCENTRIC BEARING BORE.…
- 19 May 1999
Support, corroded
CLT - DURING SHOP VISIT, FOUND CORROSION IN BEARING RETAINER BORE AT INBOARD MID FLAP INBOARD CARRIAGE, INBOARD SUPPORT ARM, AT ECCENTIC BEARING BORE.…
- 19 May 1999
Support, corroded
CLT - DURING SHOP VISIT, FOUND CORROSION IN BEARING RETAINER BORE AT INBOARD MID FLAP OUTBOARD CARRIAGE, INBOARD SUPPORT ARM AT ECCENTRIC BEARING BORE.…
- 19 May 1999
Support, corroded
CLT - DURING SHOP VISIT, FOUND CORROSION ON CARRIAGES SUPPORT ARM INBOARD MID FLAP, INBOARD CARRIAGE, OUTBOARD ARM AT BEARING MOUNT HOLE FOR ECCENTRIC…
- 23 Apr 1999
Egt Indication, malfunctioned
SDF - FLT 1266 - EN ROUTE FROM MCI-DCA, AT FL330, THE NR 1 ENGINE EGT WAS ON THE RISE AND WENT TO FULL SCALE WITH RED EGT OVERTEMP LIGHT ILLUMINATING. FUEL…
- 8 Mar 1999
Beam, corroded
CLT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND CORROSION 1 INCH BY 2 INCH STATION 312 LBL 11 BEAM. REPAIRED PER SRM 53-10-51. (M)
- 8 Mar 1999
Floorbeam, corroded
CLT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND CORROSION .5 BY .5 INCH AT BS 947 LBL 15 RBL 15 AROUND NUT PLATE HOLES FLOORBEAM. CORROSION TASK NR…
- 8 Mar 1999
Floorbeam, corroded
CLT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND CORROSION .5 BY .5 INCH AT BS 967 RBL 18 FLOORBEAM, CORROSION TASK NR C53-107-02. INSTALLED 'T' CAP WITH…
- 8 Mar 1999
Frame, cracked
CLT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND A .5 INCH CRACK STATION 380 BETWEEN S8L AND 9L. INSTALLED DOUBLER PER EA 63838A AND SRM 53-00-07 FIG 202. (M)
- 8 Mar 1999
Frame, cracked
CLT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND A .5 INCH CRACK STATION 380 BETWEEN S8R AND 9R. INSTALLED DOUBLER PER EA 63838A AND SRM 53-00-07. (M)
- 8 Mar 1999
Frame, cracked
CLT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND A .5 INCH CRACK STATION 400 BETWEEN S8L AND 9L FRAME. INSTALLED DOUBLER PER EA 63838A AND SRM 53-00-07 FIG…
- 8 Mar 1999
Frame, cracked
CLT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND A .5 INCH CRACK STATION 440 BETWEEN S8R AND 9R FRAME. INSTALLED DOUBLER PER EA 63838A AND SRM 53-00-07 FIG…
- 8 Mar 1999
Frame, cracked
CLT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND A .5 INCH CRACK STATION 480 BETWEEN S8L AND 9L FRAME. INSTALLED DOUBLER PER EA 63838A AND SRM 53-00-07 FIG…
- 8 Mar 1999
Frame, cracked
CLT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND A .5 INCH CRACK STATION 500A BETWEEN S8L AND 9L. INSTALLED DOUBLER PER EA 63838A AND SRM 53-00-07. (M)
- 8 Mar 1999
Frame, cracked
CLT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND A .5 INCH CRACK STATION 500A BETWEEN S8R AND 9R FRAME. INSTALLED DOUBLER PER EA 63838A AND SRM 53-00-07. (M)
- 8 Mar 1999
Frame, cracked
CLT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND A .5 INCH CRACK STATION 500D BETWEEN S8R AND 9R FRAME. INSTALLED DOUBLER PER EA 63838A AND SRM 53-00-07. (M)
- 8 Mar 1999
Frame, cracked
CLT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND A .5 INCH CRACK STATION 727B BETWEEN S8L AND 9L FRAME. INSTALLED DOUBLER PER EA 63838A AND SRM 53-00-07 FIG…
- 8 Mar 1999
Frame, cracked
CLT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND A .5 INCH CRACK STATION 727F BETWEEN S8R AND 9R FRAME. INSTALLED DOUBLER PER EA 63838A AND SRM 53-00-07. (M)
- 8 Mar 1999
Frame, cracked
CLT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND A .25 INCH CRACK STATION 747L BETWEEN S8L AND 9L FRAME. INSTALLED DOUBLER PER EA 63838A AND SRM 53-00-07. (M)
- 8 Mar 1999
Frame, cracked
CLT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND A .5 INCH CRACK STATION 747 BETWEEN S8L AND 9L FRAME. INSTALLED DOUBLER PER EA 63838A AND SRM 53-00-07. (M)
- 8 Mar 1999
Frame, cracked
CLT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND A .5 INCH CRACK STATION 827 BETWEEN S8L AND 9L FRAME. INSTALLED DOUBLER PER EA 63838A AND SRM 53-00-07. (M)
- 8 Mar 1999
Frame, cracked
CLT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND A .25 INCH CRACK STATION 867L BETWEEN S8L AND 9L FRAME. INSTALLED DOUBLER PER EA 63838A AND SRM 53-00-07 FIG…
- 8 Mar 1999
Frame, cracked
CLT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND A .5 INCH CRACK STATION 867 BETWEEN S8L AND 9L FRAME. INSTALLED DOUBLER PER EA 63838A AND SRM 53-00-07. (M)
- 8 Mar 1999
Frame, cracked
CLT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND A .5 INCH CRACK STATION 787 BETWEEN S8L AND 9L FRAME. INSTALLED DOUBLER PER EA 63838A AND SRM 53-00-07. (M)
- 8 Mar 1999
Skin, distorted
CLT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND SKIN DISTORTED ON FUSELAGE BETWEEN STATION 867 TO 887 BETWEEN STRINGER 22R TO 23R. INSTALLED DOUBLER PER SRM…
- 8 Mar 1999
Floorbeam, corroded
CLT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND CORROSION AT STATION 312 AND 328 LBL 11 FLOOR SUPPORT. REPAIRED PER SRM 51-10-2. (M)
- 8 Mar 1999
Floorbeam, corroded
CLT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND CORROSION AT BSL 859 LBL 3 FLOORBEAM. INSTALLED DOUBLER PER TR 53-10-06. (M)
- 8 Mar 1999
Floorbeam, corroded
CLT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND A 1 INCH BY 8 INCH AREA OF CORROSION AT BS 747 RBBL 13.8 FLOORBEAM. INSTALLED TIE DOWN TRACK PER SRM 53-00-53…
- 8 Mar 1999
Floorbeam, corroded
CLT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND CORROSION AT STATION 773 RBL 3, 1 INCH BY 1 INCH AT NUTPLATE HOLES OF FLOOR SUPPORT. REPAIRED PER TR 53-10-06.…
- 31 Oct 1998
Acm, failed
TPA - FLT 1425 - AFTER TAKEOFF FROM TPA, CREW COULD NOT GET THE AIRCRAFT TO PRESSURIZE. CREW WENT THROUGH ALL PROCEDURES BUT AIRCRAFT FAILED TO PRESSURIZE.…
- 24 Sep 1998
Overheat Loop, failed
CLT - FLT 835 - DURING CLIMB-OUT FROM CLT, THE NR 1 ENGINE OVERHEAT LIGHT ILLUMINATED. AFTER ACCOMPLISHING APPROPRIATE CHECKLIST, LIGHT EXTINGUISHED. FLIGHT…
- 17 May 1996
Fuse, failed
LGA - MAINTENANCE FOUND THE EMERGENCY EXIT AISLE LIGHTS, IN ROW 24 AND 25, WON'T ILLUMINATE. MAINTENANCE REPLACED FUSE IN BATTERY PACK. (M)
- 9 Feb 1996
Windshield, shattered
TPA - FL 1798 - EN ROUTE CLT-SRQ - THE CAPTAINS OUTER WINDOW PANE SHATTERED. THE FLIGHT DIVERTED TO TPA AND LANDED WITH NO FURTHER INCIDENT. MAINTENANCE…
- 26 Sep 1995
Air Data Comp, failed
PIT - FLT NR 0497 - AFTER TAKEOFF FROM PIT, FLIGHT OFFICERS AIRSPEED, ALTIMETER, AND RATE OF CLIMB INDICATORS FAILED. FLIGHT RETURNED TO PIT AND LANDED…
- 20 Apr 1995
Intercostal, corroded
INT - DURING Q-5 CHECK VISUAL INSPECTION, FOUND CORROSION 2 INCH BY 2 INCH BS 747 TO BSL 767 LBL 24 INCHES. REPAIRED PER SRM 51-10-2. CORROSION TASK NR…
- 4 Apr 1995
Floorbeam, corroded
INT - DURING Q-5 CHECK VISUAL INSPECTION, FOUND CORROSION APPROXIMATELY 4 SQUARE INCH BS 987 LBL 50 TO RBL 50. REPAIRED PER TR 53-10-01A. CORROSION TASK NR…
- 4 Apr 1995
Floorbeam, corrosion
INT - DURING Q-5 CHECK VISUAL INSPECTION, FOUND 1.75 INCH DIAMETER CORROSION BS 947 LBL 4. REPAIRED PER EA 39037. REPAIRED PER EA 39037. CORROSION TASK NR…
- 4 Apr 1995
Angle, corroded
INT - DURING Q-4 CHECK VISUAL INSPECTION, FOUND CORRODED AREA (SIZE UNKNOWN) BS 927 TO BS 1006 AT AFT ENTRY DOOR. REPAIRED PER SRM 51-10-2. CORROSION TASK NR…
- 4 Apr 1995
Angle, corroded
INT - DURING Q-4 CHECK VISUAL INSPECTION, FOUND CORRODED AREA (SIZE UNKNOWN) BS 967-986.5 AT AFT SERVICE DOOR. REPAIRED PER SRM 51-10-2. CORROSION TASK NR…
- 31 Mar 1995
Intercostal, corroded
INT - DURING Q-5 CHECK VISUAL INSPECTION, FOUND 1.5 INCH DIAMETER CORROSION AT SCREW HOLE, BS 975 RBL 18. REPAIRED PER SRM 51-10-2. CORROSION TASK NR…
- 30 Mar 1995
Floorbeam, corroded
INT - DURING Q-5 CHECK VISUAL INSPECTION, FOUND 1.5 INCH BY 2 INCH CORRODED AREA BS 987 LBL 50. REPAIRED PER TR 53-10-01A. CORROSION TASK NR C53-107-02,…
- 29 Mar 1995
Intercostal, corrosion
INT - DURING Q-4 CHECK VISUAL INSPECTION, FOUND CORROSION 2 INCHES BY 2 INCHES BS 967 RBL 18 INCHES. REPAIRED PER SRM 53-60-51. CORROSION TASK NR C53-107-02,…
- 29 Mar 1995
Intercostal, corrosion
INT - DURING Q-4 CHECK VISUAL INSPECTION, FOUND CORROSION 2 INCH BY 2 INCH BS 947 TO 967 LBL 18 INCHES. REPAIRED PER SRM 53-60-51. CORROSION TASK NR…
- 28 Mar 1995
Intercostal, corroded
INT - DURING Q-5 CHECK VISUAL INSPECTION, FOUND CORROSION 2 INCHES BY 2 INCHES BS 967 LBL 24. REPAIRED PER SRM 51-10-2. CORROSION TASK NR C53-107-02,…
- 27 Mar 1995
Intercostal, corrosion
INT - DURING Q-4 CHECK VISUAL INSPECTION FOUND 3 INCH BY 3 INCH CORROSION TOP FLANGE AREA BS 947 TO BS 967 LBL 60 INCHES. REPAIRED PER SRM 51-10-2. CORROSION…
- 23 Mar 1995
Angle, corroded
INT - DURING Q-5 CHECK VISUAL INSPECTION, FOUND 180 INCHES OF CORROSION BS 727C TO BS 827 S-25L. REPAIRED PER SRM 51-10-2. CORROSION TASK NR C53-208-01,…
- 23 Mar 1995
Angle, corroded
INT - DURING Q-4 CHECK VISUAL INSPECTION, FOUND 36 INCH BY 3 INCH CORRODED AREA BETWEEN BS 294 AND 344 RBL 55. REPAIRED PER SRM 51-10-2. CORROSION TASK NR…
- 3 Mar 1995
Angle, corroded
INT - DURING Q-4 CHECK VISUAL INSPECTION, FOUND 1 INCH DIAMETER SPOTS OF CORROISON AT SCREW HOLES, BS 787-767 S-25R. REPAIRED PER SRM 51-10-02. CORROSION TASK…