N153SL
2002 Piaggio P180 standard FAA →
registration
- 2002
service difficulty reports
12 reports
- 2 Oct 2012
Switch, dirty
DESCRIPTION OF EVENT: CREW REPORTS UNCOMMANDED AUTOFEATHER ON SHORT FINAL. CLEANED & ADJUSTED AUTOFEATHER CAM SWITCHES IAW AMM 76-11-00. OP`S CHECK IAW AMM…
- 21 Sep 2012
Fcu, unserviceable
IN FLIGHT AND ON SHORT FINAL, THE AUTOFEATHER SYSTEM WAS ATTEMPTING AN UNCOMMANDED FEATHER. PERFORMED ENGINE GROUND RUNS AND NOTED RT ENGINE LAGS IN THE…
- 7 Sep 2012
Engine, failed
ENGINE OIL LEAK. FIXED LEAK, RAN ENGINE, NO OIL LEAK WAS FOUND. DURING DEPARTURE, HEARD A NOISE IN AFT SECTION OF PLANE AND NOTICED A VIBRATION. SHORTLY…
- 28 Aug 2012
Propeller, malfunctioned
RIGHT PROPELLER UNCOMMANDED AUTOFEATHER PRIOR TO LANDING. ADJUSTED BETA VALVE AND INSPECTED BETA RING IAW AMM, CH: 76-10-00. OPS CHECKED GOOD, NO DEFECTS NOTED.
- 22 Aug 2012
Autofeather Sys, malfunctioned
THE CREW REPORTS THEY RECEIVED AN UNCOMMANDED AUTOFEATHER ON THE LT ENGINE ON THE DESCENT. LANDED SAFELY.
- 27 Feb 2012
Elevator, misinstalled
ACFT WAS IN FACILITY FOR PAINT. FLIGHT CONTROLS REMOVED: PAINTED, BALANCED AND REINSTALLED. DUE TO THE ELEVATORS BEING MISLABELED, THE ELEVATORS WERE…
- 21 Nov 2011
Autofeather Sys, malfunctioned
AUTOFEATHER CYCLES DURING LANDING
- 20 Nov 2011
Autofeather Sys, malfunctioned
AUTOFEATHER CYCLES DURING LANDING WITH LOW POWER SETTING.
- 5 Aug 2010
Warning Light, illuminated
BAGGAGE DOOR LIGHT ILLUMINATED DURING CLIMB, PILOT REFFERED TO QRH AND SECURED NR1 ENGINE, PLANE RETURNED TO FIELD WITHOUT INCIDENT, NO EMERGENCY WAS DECLARED.
- 25 Aug 2006
Line, chafed
DURING 3000 HOUR D-CHECK FOUND OIL SCAVENGE LINE PN 3040124 AT SCAVENGE PUMP CHAFED APPROX 50 PERCENT THROUGH BY CONTACT WITH CRIMP TYPE CLAMP THAT SECURES…
- 28 Jun 2006
Stop, broken
DURING D CHECK (3000 HOUR INSPECTION) FOUND RUDDER STOP LOCATED AT BOTTOM OF RUDDER BROKEN IN TWO. BREAK OCCURRED AT SCREW HOLES USED TO ATTACH WEAR STRIP TO…
- 22 Jun 2006
Tube, chafed
DURING D-CHECK (3000 HOUR INSPECTION) FOUND WING LEADING EDGE ANTI-ICE PLUMBING CHAFFED 50 PERCENT OF WALL THICKNESS BY LEADING EDGE TEMP SENSOR BRACKET.