N14233
Boeing 737-217 FAA →
earlier registrations
1 past record
service difficulty reports
52 reports
- 25 Sep 1998
Line, leaking
THE NR 1 ENGINE THROTTLE WAS TWO KNOBS AHEAD OF NR 2 WITH CLIMB POWER SET OUT OF MSP. THE SPLIT INCREASED TO ABOUT 3 KNOBS DIFFERENCE AS CLIMB PROGRESSED.…
- 14 Jan 1998
Control Cable, out of adj
THE LANDING GEAR HANDLE COULD NOT BE MOVED BEYOND THE OFF POSITION AFTER TAKEOFF. ABNORMAL PROCEDURES WERE COMPLIED WITH AND THE AIRCRAFT WAS RETURNED TO BOS…
- 12 Jan 1998
Solenoid, inoperative
THE LANDING GEAR HANDLE WOULD NOT GO PAST THE OFF DETENT AFTER TAKEOFF. THE OVERRIDE DID NOT WORK EITHER. THE AIRCRAFT WAS RETURNED TO GSO WHERE IT LANDED…
- 20 Sep 1997
Hyd Line, chafed
THE A-HYDRAULIC SYSTEM BEGAN TO LEAK SLOWLY WHILE EN ROUTE. THE HYDRAULIC PUMPS WERE TURNED OFF BEFORE LOW PRESSURE LIGHTS ILLUMINATED. THE AIRCRAFT WAS…
- 6 Feb 1997
Skin, cracked
INSPECTION FOUND A 4.5 INCH CRACK IN RT WING LEADING EDGE SKIN AT WS 190. THE CRACKED AREA WAS REMOVED, REPAIR PARTS WERE FABRICATED AND INSTALLED IAW SRM…
- 5 Feb 1997
Support, broken
INSPECTION FOUND FORWARD CARGO PIT FLOOR SUPPORT BROKEN AT STA 490 ABOVE STRINGER 28L. THE BROKEN SECTION WAS REMOVED IAW SRM 53-10-1 AND 51-30-2, A NEW…
- 5 Feb 1997
Fitting, cracked
INSPECTION FOUND A 1 INCH CRACK AT BOTTOM AFT FACE OF VERTICAL STABILIZER LT AFT OUTBOARD FITTING TO LUG. THE CRACKED FITTING WAS REMOVED, A NEW FITTING WAS…
- 5 Feb 1997
Stringer, cracked
INSPECTION FOUND A .5 INCH CRACK IN RADIUS OF STRINGER 6L AT STA 787. THE CRACKED SECTION OF STRINGER WAS REMOVED, A STRINGER REPAIR WAS FABRICATED AND…
- 5 Feb 1997
Stringer, cracked
INSPECTION FOUND A 2 INCH CRACK IN STRINGER AT STA 907. THE CRACKED SECTION OF STRINGER WAS REMOVED IAW SRM 53-10-3, STRINGER SPLICES WERE FABRICATED AND…
- 5 Feb 1997
Skin, cracked
INSPECTION FOUND A 1.5 INCH CRACK IN SKIN PANEL AT LEADING EDGE STA 213 OF LT WING LOWER SURFACE. A DOUBLER WAS FABRICATED AND INSTALLED IAW SRM 51-40-0 AND…
- 5 Feb 1997
Bulkhead Web, punctured
INSPECTION FOUND A .25 INCH DIAMETER PUNCTURE IN AFT PRESSURE BULKHEAD WEB AT 8:30 POSITION, TWO FEET FROM CENTER. THE DAMAGED AREA WAS REMOVED, A DOUBLER AND…
- 5 Feb 1997
Web, cracked
INSPECTION FOUND THREE EACH CRACKS AT RIVETS OF WEB UNDER NR 3 SEAT TRACK AT BS 715. THE CRACKS WERE APPROXIMATELY 2 INCHES LONG. THE CRACKED AREAS WERE…
- 5 Feb 1997
Angle, cracked
INSPECTION FOUND STA 540 WING TO BODY FRAME CRACKED LOWER AREA LBL 31, T-ANGLE WAS CRACKED INTO TWO PIECES. THE CRACKED SECTION WAS REMOVED, ANGLES AND…
- 5 Feb 1997
Angle, cracked
INSPECTION FOUND A 2.5 INCH CRACK IN RIB LOWER CHORD ANGLE AT S3 IN FUEL ACCESS PANEL 7202 AT LT WING FUEL TANK, WBL 135.5. THE CRACKED AREA WAS REMOVED, A…
- 4 Feb 1997
Bulkhead, cracked
INSPECTION FOUND A 8.25 INCH CRACK AT RBL 7.5 AND A 5.25 INCH CRACK AT LBL 6.12 IN BULKHEAD, STA 294.5. THE CRACKED AREAS WERE CUT OUT, DOUBLERS AND FILLERS…
- 4 Feb 1997
Frame, corroded
INSPECTION FOUND STA 270 LT FRAME, STA 277 LT CAP ANGLE, FRAME WEB, STIFFENER CHANNELS AT STA 270 AND 277, AND BEAR STRAP AT STA 277 LT CORRODED. FRAME…
- 4 Feb 1997
Frame, corroded
INSPECTION FOUND STA 250 RT VERTICAL STIFFENER, STA 277 RT FRAME WEB, STA 270 RT SHEAR TIE ANGLE CHORD IN RT NOSE WHEEL WELL CORRODED. A VERTICAL BEAM, FRAME…
- 3 Feb 1997
Floorbeam, cracked
INSPECTION FOUND A 1 INCH CRACK IN LOWER RADIUS OF FLOORBEAM AT STA 685, BL 0. A 1 INCH CRACK WAS FOUND IN TRANSVERSE BEAM AT STA 675, BL 0. THE FLOORBEAM WAS…
- 3 Feb 1997
Floorbeam, cracked
INSPECTION FOUND A 2 INCH CRACK ON UPPER FLANGE OF FLOORBEAM AT BS 667, BL 0. A REPAIR WAS FABRICATED AND INSTALLED IAW ECRA 5710-01779.
- 3 Feb 1997
Angle, corroded
INSPECTION FOUND FLOOR SUPPORT ANGLE CORRODED AT STA 947 TO 970, ON RT SIDE. THE CORRODED SECTION OF FLOOR SUPPORT WAS REMOVED, A REPAIR SECTION AND SPLICES…
- 3 Feb 1997
Skin, gouged
INSPECTION FOUND AFT CARGO DOOR CUTOUT FORWARD LOWER CORNER SKIN GOUGED. THE GOUGED SKIN WAS CUT OUT, REPAIR FILLERS AND DOUBLER WERE FABRICATED AND INSTALLED…
- 3 Feb 1997
Floorbeam, corroded
INSPECTION FOUND UPPER FLANGE OF FLOORBEAM CORRODED AT STA 328, RBL 24 TO RBL 50. THE UPPER CHORD OF BEAM WAS REMOVED. REPAIRS WERE FABRICATED AND INSTALLED…
- 3 Feb 1997
Support, cracked
INSPECTION FOUND TWO 8 INCH CRACKS IN FORWARD CARGO PIT FLOOR SUPPORT AT STA 460, RBL 14. THE FLOOR SUPPORT WAS REMOVED AND A NEW SUPPORT WAS INSTALLED IAW…
- 3 Feb 1997
Floorbeam, corroded
INSPECTION FOUND UPPER FLANGE OF FLOORBEAM CORRODED AT STA 980. THE UPPER FLANGE WAS REMOVED. A REPAIR WAS FABRICATED AND INSTALLED IAW SRM 53-10-9 AND 51-30-2.
- 3 Feb 1997
Floorbeam, corroded
INSPECTION FOUND FLOORBEAM CORRODED AT STA 744, RBL 15 TO LBL 15. THE CORRODED SECTION OF FLOORBEAM WAS REMOVED. A FLOORBEAM REPAIR WAS FABRICATED AND…
- 3 Feb 1997
Floorbeam, corroded
INSPECTION FOUND FLOORBEAM CORRODED BETWEEN SEAT TRACKS 2-13 AT STA 360. A REPAIR WAS FABRICATED AND INSTALLED IAW SRM 53-10-9.
- 3 Feb 1997
Frame, cracked
INSPECTION FOUND FRAME CRACKED AND BENT AT STA 987, BL ZERO - RBL 10. A REPAIR WAS FABRICATED AND INSTALLED IAW SRM 53-10-4 AND 51-30-2.
- 30 Jan 1997
Stringer, cracked
INSPECTION FOUND A .25 INCH CRACK IN STRINGER AT RT WING FS 465 LEADING EDGE SLAT WELL. THE STRINGER WAS REMOVED AND A NEW STRINGER WAS FABRICATED AND…
- 30 Jan 1997
Bulkhead, cracked
INSPECTION FOUND AN 8 INCH CRACK IN BULKHEAD AT STA 178, RBL 29 AND A 10 INCH CRACK WAS FOUND IN BULKHEAD AT STA 178, LBL 29. THE CRACKED AREAS WERE CUT OUT,…
- 5 Apr 1996
Floorbeam, cracked
GSO - INSPECTION FOUND A .50 INCH CRACK AND CORROSION ON COCKPIT AFT FLOORBEAM AT STA 459. THE CORRODED AREAS WERE REMOVED. NEW ANGLES WERE FABRICATED AND…
- 30 Mar 1996
Frame, cracked
GSO - INSPECTION FOUND A 3 INCH CRACK IN LOWER FORWARD FRAME OF C-1 DOOR. THE FRAME SECTION WAS REMOVED AND REPLACED IAW SRM 51-30-2. (X)
- 28 Mar 1996
Skin, corroded
GSO - INSPECTION FOUND THE NR 2 ENGINE FORWARD OUTBOARD COWL OUTER SKIN CORRODED AROUND ENGINE RADIUS WARNING PLACARD. THE CORRODED SECTION OF SKIN WAS CUT…
- 25 Jun 1995
Line, chafed
DFW - FLT 1648 - LOSS OF A-SYSTEM HYD QUANTITY. REQUIRED BRAKE REPLACEMENT TO REMOVE FROM RUNWAY DUE TO OVERTEMP ON LANDING. FOUND LINE ON NR 2 ENGINE DRIVEN…
- 13 Jun 1995
Cargo Door, cracked
CLE - FLT 1639 - MAINTENANCE FOUND TWO CRACKS IN THE FORWARD CARGO DOOR AT THE SEAL RETAINER WHILE UNDERGOING A DECAY CHECK FOR PRESSURIZATION PROBLEMS. THE…
- 28 Apr 1995
Fan Blade, bent
FLT NR 1464 - IAH - ON MAINTENANCE WALKAROUND, FOUND NR 2 ENGINE FAN BLADE BENT OUT OF LIMITS. AIRCRAFT REMOVED FROM SERVICE ENGINE C1 DISK FAN ASSY. CHANGE…
- 15 Apr 1995
Hyd Module, failed
GSO - FLT 1735 - THE A-HYDRAULIC SYSTEM PRESSURE DROPPED TO ZERO DURING CLIMB OUT OF GSO. CHECK LIST PROCEDURES WERE COMPLIED WITH AND THE AIRCRAFT WAS…
- 1 Feb 1995
Intercostal, cracked
GSO - INSPECTION FOUND A 1 INCH CRACK IN INTERCOSTAL AT BS 508 BETWEEN STR 28L AND STR 28R. THE INTERCOSTAL WAS REMOVED AND REPLACED IAW SRM 51-30-2. (X)
- 1 Feb 1995
Frame, cracked
GSO - INSPECTION FOUND A .25 INCH CRACK IN FORWARD ENTRY DOOR FORWARD FRAME CUT OUT AT UPPER HINGE ARM. A REPAIR WAS FABRICATED AND INSTALLED IAW SRM 51-40-2,…
- 1 Feb 1995
Floorbeam, cracked
GSO - INSPECTION FOUND A 1 INCH CRACK IN STA 639 LT SIDE FLOORBEAM WEB CABLE CUTOUT. THE FLOORBEAM WEB WAS REPAIRED IAW BOEING DRAWING 65C25211. (X)
- 1 Feb 1995
Floor Panel, corroded
GSO - INSPECTION FOUND THE NR 6 FLOOR PANEL SUPPORT CORRODED AT STA 312. THE PANEL SUPPORT WAS REPAIRED IAW SRM 51-30-2. (X)
- 1 Feb 1995
Chord, cracked
GSO - INSPECTION FOUND A .50 INCH CRACK IN RT STA 727 OUTBOARD CHORD AT STR 18A. THE CRACKED CHORD WAS REMOVED AND A NEW CHORD WAS FABRICATED AND INSTALLED…
- 1 Feb 1995
Stringer, cracked
GSO - INSPECTION FOUND A 1 INCH CRACK IN STR 5R AT STA 685. THE CRACK WAS STOP DRILLED AND A REPAIR CHANNEL WAS INSTALLED IAW SRM 53-10-3. (X)
- 1 Feb 1995
Frame, cracked
GSO - INSPECTION FOUND A .50 INCH CRACK IN STA 578 MAIN CABIN FRAME AT STR 16 - STR 17L. THE FRAME WAS REPAIRED IAW SRM 51-40-3 AND SRM 51-30-2. (X)
- 1 Feb 1995
Belt Frame, cracked
GSO - INSPECTION FOUND A 2 INCH CRACK IN BELT FRAME AT BS 420, STR 22L. THE CRACK WAS REPAIRED IAW BOEING DRAWING 65C25113. (X)
- 1 Feb 1995
Frame, cracked
GSO - INSPECTION FOUND A 1 INCH CRACK IN BELT FRAME AT BS 500A BETWEEN STR 21L AND STR 20L. THE CRACKED FRAME WAS CUT OUT IAW BOEING DRAWING 65C225113 AND A…
- 1 Feb 1995
Frame, cracked
GSO - INSPECTION FOUND A .50 INCH CRACK IN BELT FRAME AT BS 480 BETWEEN STR 21L AND STR 20L. THE CRACK WAS STOP DRILLED AND A REPAIR WAS INSTALLED IAW SRM…
- 1 Feb 1995
Frame, cracked
GSO - INSPECTION FOUND A 1 INCH CRACK IN BELT FRAME AT BS 500 BETWEEN STR 21L AND STR 20L. THE CRACKED BELT FRAME WAS REMOVED AND A REPAIR WAS INSTALLED IAW…
- 1 Feb 1995
Intercostal, cracked
GSO - INSPECTION FOUND A 1 INCH CRACK IN INTERCOSTAL BEHIND AFT FORMER IN E AND E BAY. THE INTERCOSTAL WAS REMOVED AND A NEW INTERCOSTAL WAS FABRICATED AND…
- 1 Feb 1995
Skin, cracked
GSO - INSPECTION FOUND A .50 INCH CRACK IN THE LT HORIZONTAL STABILIZER TRAILING EDGE LOWER SKIN AT STA 66. THE CRACK WAS STOP DRILLED AND REPAIR DOUBLERS…
- 1 Feb 1995
Skin, corroded
GSO - INSPECTION FOUND CORROSION ON RT EXTERNAL SKIN AND DOUBLER AT STA 727 BETWEEN STR 17R AND STR 18R. THE CORROSION WAS REMOVED AND A DOUBLER IN INSTALLED…
- 1 Feb 1995
Skin, cracked
GSO - INSPECTION FOUND SKIN CRACKED AT SEVERAL FASTENER HOLES BETWEEN BS 188 AND BS 251.6 ON THE LT SIDE OF FUSELAGE. ALL CRACKS WERE APPROXIMTELY .25 INCH…
- 1 Feb 1995
Skin, cracked
GSO - INSPECTION FOUND SKIN CRACKED AT SEVERAL FASTENER HOLES ON RT SIDE OF FUSELAGE BETWEEN BS 188 AND BS 251.6. ALL CRACKS WERE APPROXIMATELY 1 INCH LONG.…